Anseong Distribution Center has Built

» Posted by on 7월 16, 2014 in Annual Report

2013 Anuual Report – Anseong Distribution Center has Built

Meaningful Reviving place Concerning the Earth

Anseong Distribution Center has Built

New distribution center was firstly completed on 27th November 2013. The site area is 27,730㎡ big with 4 floors above ground and 1 underground. After 5 to 6 years when the second construction completed, this new distribution center will able to handle the total distribution till 2024.

Set up Photovoltaic Power Plant

Hansalim Sunlight Generation Cooperative with 1,384 members and the investment of 1.31 million USD set up 438.9kW of photovoltaic power plant on the roof of Anseong Distribution Center which is 5,200㎡ big. Hansalim photovoltaic power plant will start its operation from the end of February 2014 producing 620thousand kW of electricity which is enough for 200 families for a year.

Reuse Bottle Washing Factory

Hansalim has promoting Reuse Bottle Campaign for long time and finally reuse bottle washing factory is built in Anseong Distribution Center. This new facility can wash maximum 9,600 bottles a day.